Comsys – Perfecting Power

Slide background

Newsdesk

On June 10th – 11th,  the Leonardo Power Quality Initiative (LPQI) holds a forum in conjunction with the official opening of the Lemcko laboratory in Kortrijk, Belgium. The Leonardo Energy Power Quality Forum is open to industry and academia and covers topics like mitigation solutions, cost impact, policy and education within the power quality field.

Comsys will hold a presentation on using active technology to mitigate flicker and the recent developments within this topic. The presentation will be held by Jonas Persson, product manager of Comsys.

For more information, please visit:

http://www.leonardo-energy.org/leonardo-energy-power-quality-forum-and-lemcko-laboratory-opening-event

After a very successful commissioning at Tidbecks in Ljungsarp the flicker-levels have been lowered from pst 1,3 to 0,4 in Östra Kind’s power grid thanks to the two installed ADF P300 Energy Optimizers.

This is the second case in short time where we have been able to help our customers to reach the pst-levels that utility companies demand, and more.

Press release at customers website (in Swedish): http://www.tidbecks.se/doc.asp?D=600002263&ShowNews=1

Machinenfabrik Reinhausen (MR) and Comsys has signed a long term strategic co-operation agreement with the intent of MR distributing Comsys ADF energy optimizer and active filter products and technology as part of MR's Power Quality Management (PQM) divisions offering.

Tetra Pak Hohhot (situated in Inner Mongolia) has chosen to invest in two ADF P300 from Comsys, resulting in significant energy consumption reduction and reduced CO2-emmissions by 367 ton/year. Commissioning will take place September 2010.